Blog

What Is a No-Rise Certification?

A no-rise certification is an engineer’s showing that floodway work will not raise the base flood elevation — 0.00 feet. It is not a FEMA map change and not a permit.

Hydrologic and Hydraulic Modeling

Hydrology is how much water. Hydraulics is where it goes. An H&H model is those two questions in a form a permit desk can argue with — not a rendering.

What Is a Watershed Management Plan?

A watershed management plan describes how a drainage basin works and what the sponsors will do about it. It is not a SWPPP, a 404 permit, or a one-pad stormwater report.

What Is the Sackett v. EPA Ruling?

Sackett v. EPA (2023) is the Supreme Court test the Corps now uses for wetland jurisdiction: a relatively permanent water plus a continuous surface connection.

What Are Isolated Wetlands?

An isolated wetland can still be a wetland. Isolated describes the connection to a relatively permanent water, not the soil — and after Sackett that difference decides 404.

What Is a Jurisdictional Determination?

A jurisdictional determination is the Corps’ finding of whether a wetland or water is a water of the United States. It is not a permit, and it is not a delineation.